Acuma

Timescale: 12 weeks

Sector: Financial
Size: 14,000Sqft
Location: “H” Hotel Dubai UAE
Project Scope: Concept Design, (MEP) Engineering Design, Emaar Approvals, Dubai Municipality (DM) Approvals, Dubai Civil Defence (DCD).

Eagle Hills

Timescale: 6 weeks

Sector: Master Developer
Size: 4,200Sqft
Location: Emaar Square Dubai

Project Scope: Concept Design, (MEP) Architectural Design, Dubai Municipality  Approvals (DM) Construction and fit out access, Raised access floor, IT structured cabling, Air conditioning, Firefighting, Lighting, Electrical, Gypsum Ceiling and Walls, Bespoke Glass Partitioning, Systems, Server and Computers, Bespoke Joinery.

Halian

Timescale: 6 weeks

Sector: IT
Size: 4,800Sqft
Location: Emaar Business Park Dubai

Project Scope: Concept Design, (MEP) Architectural Design Engineering Design, Emaar Approvals, Dubai Municipality  Approvals (DM), Dubai Civil Defense (DCD) Construction and fit out access, Raised access floor, IT structured cabling, Air conditioning, Firefighting, Lighting, Electrical, Gypsum Ceiling and Walls, Bespoke Glass Partitioning, Systems, Server and Computers, Bespoke Joinery, Phone System, Raised access floor

Finishes- Polished concrete floors, wooden effects, bespoke wall designs, lighting effects, branding and signage, IT and IP phone Integration, cabinets, Workplace Furniture and Bespoke Furniture, Bespoke Reception

Sovereign

Timescale: 10 weeks

Sector: Financial
Size: 8,200Sqft
Location: “H” Hotel Dubai UAE

Project Scope: Concept and fit out of access, Raised access floor, IT structured cabling, Air conditioning, Firefighting, Lighting, Electrical, Gypsum Ceiling and Walls, Glass Partitioning, IT and IP phone systems, Server and Computers, Bespoke Joinery.

Parker Drilling

Timescale: 10 weeks

Sector: Oil And Gas
Size: 14000Sqft
Location: “H” Hotel Dubai UAE

Project Scope: Concept Design, Architectural Design (MEP) Engineering Design, Approvals, Dubai Municipality (DM) Approvals, Dubai Civil Defence (DCD)

Hamac

Timescale: 8 weeks

Sector: Retail
Size: 1,800Sqft
Location: Jumeirah Beach Residence, Beach Walk Dubai

Project Scope: Concept Design, Architectural Design (MEP) Engineering Design, Approvals, Miras approvals, Dubai Municipality (DM) Approvals, Dubai Civil Defence (DCD)

Caboodle

Timescale: 6 weeks

Sector: Retail
Size: 1,800Sqft
Location: City Walk dubai

Project Scope: Concept Design, (MEP) Architectural Design Engineering Design, Emaar Approvals, Dubai Municipality  Approvals (DM), Dubai Civil Defense (DCD) Construction and fit out access, Raised access floor, IT structured cabling, Air conditioning, Firefighting, Lighting, Electrical, Gypsum Ceiling and Walls, Bespoke Glass Partitioning, Systems, Server and Computers, Bespoke Joinery, Phone System, Raised access floor

Finishes- Polished concrete floors, wooden effects, bespoke wall designs, lighting effects, branding and signage, IT and IP phone Integration, cabinets, Workplace Furniture and Bespoke Furniture, Bespoke Reception

Cougar Drilling Solutions

Timescale: 10 weeks

Sector: Oil and Gas Manufacturing
Size: 8,500Sqft
Location: JLT dubai

Project Scope: Concept Design, (MEP) Architectural Design Engineering Design, Emaar Approvals, Dubai Municipality  Approvals (DM), Dubai Civil Defense (DCD) Construction and fit out access, Raised access floor, IT structured cabling, Air conditioning, Firefighting, Lighting, Electrical, Gypsum Ceiling and Walls, Bespoke Glass Partitioning, Systems, Server and Computers, Bespoke Joinery, Phone System, Raised access floor

Finishes- Polished concrete floors, wooden effects, bespoke wall designs, lighting effects, branding and signage, IT and IP phone Integration, cabinets, Workplace Furniture and Bespoke Furniture, Bespoke Reception

Hilton Dubai Creek

Golden Sands Al Nahda

Arenco Villas

Al Bahia and Al Shamkha Abu Dhabi Ambulatory Health Care

GEMS World Academy